Representative project outcomes across turbine-generator engineering, controls and excitation support, outage execution, and international inspection work. Specific scope, client, and financial details are shared at engagement stage.
A generator trip triggered multiple relay indications confirming a real B-phase stator ground on the generator side of the breaker. Investigation identified displaced coil support hardware and damaged groundwall insulation in the end-winding region, creating risk of a long-duration rewind and major outage exposure.
During a scheduled outage, plant leadership required independent validation of the Brush A30 excitation system to prevent hidden controls risk, avoid restart delays, and complete the work without extending the outage critical path.
A scheduled outage required full validation of the EX2000 excitation system, field flashing equipment, and associated controls to eliminate hidden reliability risks and prevent unnecessary outage extension.
A planned major inspection identified dusting indications in the stator endwinding region, creating long-term insulation degradation risk and potential lifecycle exposure if left uncorrected.
SYNVERA supports utilities, OEMs, industrial operators, and service providers managing high-consequence power and industrial assets. Contact us to discuss your specific project or support need.